plaster moulding runs on a lath and plaster ceiling in manchester

Plaster ribs run insitu at Wythenshawe Hall

6 out of the 8 plaster ribs have been now run insitu using "hanging moulds" in the Clock Room at Wythenshawe Hall Manchester. This method of running mouldings is seldom used as it requires a lot of setting up. In this case it was unavoidable as there are no bearing points around the roof lantern and all the ceilings  are splayed.

0 0
Feed